How quality is checked, and where
Quality is not a final inspection; it is a set of checks placed where a fault can still be corrected cheaply. Ours run at five points, and each one has a named owner on the floor.
- Fabric in. Every roll is checked against the approved lot for shade, weight and defects before it is cut. A shade variation found here costs a roll; found after cutting, it costs the order.
- Cutting. The first layer is measured against the pattern, and the marker is checked for grain and nap direction.
- In-line. Measurements at chest, shoulder, sleeve and back length on the first pieces off each line, then every twentieth piece.
- Pressing and finishing. Steam finish, thread clean, hangtag and label placement checked piece by piece.
- Final. AQL 2.5 at major defect level, with third-party inspection on request.
Numbers we hold ourselves to
| Check | Standard |
|---|---|
| Chest, waist, sleeve, inseam | ±0.5 cm on finished garment |
| Shoulder and back length | ±0.5 cm, no plus tolerance on shoulder |
| Seam stitch density | 14–16 stitches per inch, verified in-line |
| Colour match | Against the approved lab dip under D65 light |
| Final inspection | AQL 2.5, third party accepted |
Certification and social compliance
ISO 9001:2023 covers the quality management system: how specifications, checks and corrective actions are recorded. It does not certify a product, and we do not present it as one. BSCI audited in 2023 with grade C covers social compliance — working hours, wages, safety and grievance channels — and the report has a date and a scope that can be checked.
Both audits are of this factory, in Humen. No other unit is covered, and no other unit is presented as ours.
Sub-contracting and traceability
Embroidery, buttonholes and washing are sometimes sent to specialist units nearby. It is declared on the quote when it applies, because a hand-off is a place where quality and schedule can slip. Each order keeps its fabric lot numbers, cutting record and measurement sheet for two years, which is what makes a repeat order run without a new approval round.
What we will not claim
No certificate we do not hold, no capacity we cannot schedule, no inspection result we have not run. If a style is outside our equipment, we say so at quoting stage — before a sample is cut rather than after a container is loaded.
If you need the audit reports, the last inspection record or a specific test result before quoting, ask for it with the enquiry — send it here.