29 November 2026
Made-to-measure versus ready-to-wear: where the cost goes
Four cost lines decide whether made-to-measure works at 100 units: pattern and cutting, cloth minimums, remakes, and the sell-through assumption.
Notes from the sample room: sourcing, fit, fabric and the numbers behind a quote.
Procurement notes from a menswear factory in Humen: how suits are specified, what a first order really costs, and where a sample goes wrong. No trend talk, no lookbook language – the things a buyer has to decide before fabric is cut.
Ten notes, written for buyers rather than for search engines. Each one ends with the numbers we would put on a quote.
29 November 2026
Four cost lines decide whether made-to-measure works at 100 units: pattern and cutting, cloth minimums, remakes, and the sell-through assumption.
29 November 2026
A tech pack is the only document the factory reads when your team is not in the building. The five pages a suit pack needs, with the numbers…
29 November 2026
Eight weeks from brief to vessel: the week-by-week plan, the Chinese New Year cut-off and the Ramadan window that decides your ship date.
29 November 2026
Your 100-piece minimum is the last in a chain: cloth, dye lots, lining and labels each have their own - and how to keep them off your invoice.
29 November 2026
100 pieces buys one colourway, or 25 pieces in each of four colours: the maths, the hidden minimums and five questions to ask first.
28 November 2026
A sample kit that gets a real costed answer at a trade show, and the five questions worth asking before you leave the booth.
28 November 2026
Spring/Summer 2027 delivers from February. Working back from the ship date, here is where the brief, sample and bulk have to land.
28 November 2026
A repeat order skips sampling but not fabric, cutting or freight. Here is the realistic timeline, and where to hold buffer.
27 November 2026
FOB Shenzhen and Guangzhou explained, what sits inside the price, what sits outside it, and when CIF or DDP is the better call.
26 November 2026
Scaling a 50 up to a 56 is not the same as grading it. Shoulder, armhole and rise have to be re-drafted, and the cost sits in the…
24 November 2026
Capacity, in-line checks, who owns the pattern, and what happens on a repeat order. A short audit list for buyers who cannot visit in person.
24 November 2026
Fabric, labour, trims, overhead and margin on a USD 58 FOB blazer — and the four decisions that move the price most.
17 November 2026
The construction inside the chest decides how a jacket behaves after twenty wears. Here is how to check it on a sample, and what each option costs.
10 November 2026
How a small label builds four styles at 100 pieces each, what the fabric minimums do to the plan, and where the cash actually sits.
3 November 2026
Chest, shoulder, sleeve, back length and trouser waist decide whether a suit fits. Here is how to write them into a size chart a factory can grade from.
Working on a range now? Send the brief and we will come back with a costed quote within one working day.