
A wedding order is one event with a hard date and a party of four to eight men in the same cloth. What fails is never the pattern: it is the cloth arriving in two shades, or the largest groomsman in a jacket cut from the medium block.
What an order looks like
- Cloth lot — one dye lot for the whole party, reserved at order, roll count confirmed before cutting.
- Size spread — typically 4–6 sizes across 6–10 sets, each graded on the wearer’s chest rather than scaled.
- Lead time — 6–8 weeks from confirmed measures, because a fitting usually moves twice before the date.
- Durability — hire and rental programmes get a reinforced seat and a spare button set; retail groomsmen do not need it.
| Programme | Lead | Cloth | Note |
|---|---|---|---|
| Retail groomsmen | 6 weeks | 260–300 g/m² worsted | Standard block |
| Hire / rental | 7 weeks | 280–320 g/m², harder finish | Reinforced seat |
| Black tie | 8 weeks | Wool with satin facing | Facing booked with the cloth |
Holding the date
We quote a delivery date, not a range, and say at quoting if the date is tight. 100 sets per style minimum; a party of six still needs the lot, so most programmes are sold as a stock style with a size run.
- Can each groomsman have his own measurements?
- Yes, inside the same cloth lot and block set. Past three distinct blocks it becomes an MTM programme and is quoted as one.
- What if someone changes size late?
- We hold 1.5 cm of side-seam allowance so it can be taken in at the fitting. Past that it is a new garment.
- Do you supply the waistcoat in the same lot?
- Yes, inside the set minimum. Tie cloth can be matched from the mill if ordered with the suit.
Send the date and the party size — we quote within one working day. Talk to us →